A treatment field is failing, or a waste contract is ending, and the problem is rarely just the equipment. Nobody has looked at the whole loop. We do that first, then draw something a public process can actually approve.
We design the loop: what comes in, what it becomes, and where it goes. Then we document it to a standard that survives a council meeting, because a design nobody can approve is not a design.
We are a design practice. You are buying the plan: drawn, costed and phased. When you are ready to build it, we supervise while a licensed contractor does the work.
We read a town the way we read a parcel: where things arrive, where they accumulate, and where the system leaks. The engineering follows the diagnosis.



The plates above are drawings from real client work. On-the-ground photography from Neal and Adriana lands alongside them as it is captured. The whole sequence, start to finish, is on a design, start to finish.
Lake Atitlán is a closed basin in Guatemala ringed by a dozen towns, and it has been failing for two decades. In 2009 the Global Nature Fund named it Threatened Lake of the Year. Everything that makes municipal work hard is present there at once: no budget, no enforcement, competing municipalities, and a lake that does not care whose jurisdiction the runoff started in.
Tell us what you are working with. It takes under two minutes.
We read every note. Expect a reply from the collective soon.